Water-equipment OEMs
Dosing, aeration and blower, membrane and analyzer vendors shipping Hydrira-ready autonomy on their equipment, with the connectors, tags and limits declared.
Utilities buy from the water-equipment OEMs, SCADA and control vendors, analyzer suppliers and engineering firms they already work with. Hydrira's distribution thesis is to ship through them: dosing, aeration, membrane and analyzer vendors shipping Hydrira-ready autonomy, and engineering firms carrying it into their utility clients.
Illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Not a measured run.
Dosing, aeration and blower, membrane and analyzer vendors shipping Hydrira-ready autonomy on their equipment, with the connectors, tags and limits declared.
SCADA, DCS and historian vendors whose systems stay the system of record while Hydrira reads, recommends and writes inside declared limits.
Design and commissioning firms that model and build plants, using Simflo for as-run commissioning and carrying Hydrira into their utility clients.
The first design partners: two to four sites with one wedge process, one number and the mandate to measure it.
Built for
Plant types, not customers. Hydrira has no plant connected yet and is recruiting its first design partners.
Stated as intent. No partner agreements are signed yet.
Dosing skids, blowers and aeration controls, membrane skids and analyzers shipped with the connectors, tags and limits Hydrira needs, so a plant can start in shadow mode on day one.
Tags, alarms and historian data read from the SCADA; shift record and report drafts written back, with the SCADA remaining the system of record and the interlocks untouched.
Simflo for as-run commissioning and what-if planning, carried from the design office into the utility clients the firm already serves.
Every Hydrira run is an ordered, inspectable sequence. This is run_scn_0418, an illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Ten steps, nine automatic, one human approval on the blower setpoint move, every action written to the shift record.
Intake-and-Screen · Flow, turbidity, ammonia and alkalinity at the headworks, and a 24-hour rain forecast that raises the expected influent by mid-afternoon.
Plant orchestrator · Simflo evaluates candidate dose, DO and flux plans over the 24-hour horizon and keeps the plans that hold permit margin through the surge.
Quality-and-Anomaly · Clarifier blanket, foam and colour from the basin cameras fused with turbidity, pH, nutrient and residual analyzers into one calibrated plant state.
Dose-and-Coagulate · Coagulant and polymer dose ramp for the surge window under turbidity, phosphorus, sludge and chemical-cost constraints, cited to the plant's dosing SOP.
Dose-and-Coagulate · A bounded setpoint move inside the declared rate and magnitude limits for the dosing pump, with the rollback value recorded first.
Aerate-and-Bio · Blower and DO setpoint schedule across the basins that meets the nitrogen and phosphorus targets at the lowest kilowatt-hours the biological state allows.
Plant orchestrator · The DO setpoint change is above the plant's threshold for this loop. The process engineer on shift reviews the predicted nutrient margin and approves.
Membrane-and-Disinfect · Flux held through the surge and the next backwash moved earlier, inside the integrity envelope; the disinfection residual minimum is untouched.
Compliance-and-Energy · Every planned setpoint checked against the discharge permit, the nutrient limits and the residual minimum, with excursion risk forecast for the horizon.
Quality-and-Conformance · Inputs, model versions, predictions, limits, the approval and every write appended to the immutable shift record the plant owns.
A treatment plant runs around the clock on variable influent, and many utilities keep plant data on site, so perception and control inference run at the plant edge. Hydrira keeps training, simulation and optimization in the cloud, in a private cloud or on-prem. Items marked planned are on the roadmap, not running.
TensorRT-optimized time-series and vision models at the plant edge; DeepStream pipelines for clarifier, basin and filter cameras; Holoscan fusing camera streams with turbidity, pH, chlorine and nutrient analyzers at 1 to 10 Hz. Jetson Thor is planned.
Water-quality forecasting, anomaly detection, control recommendation and compliance retrieval served with per-tenant routing, model versioning and an audit id on every call. Self-hosted for utility on-prem and edge deployment. Planned.
Time-series transformers, vision models and NeMo-tuned process and compliance reasoning trained on plant telemetry, operator corrections, images, alarms, lab results, permits and SOPs. Design target: weekly fine-tuning per design-partner cohort, then monthly fleet refreshes. Planned.
Simflo runs plant hydraulics, clarifier and filtration behaviour, membrane fouling, oxygen transfer and biological response as a GPU simulation calibrated to the live plant, with Modulus surrogates for fast evaluation. Planned.
Wet-weather surges, sensor drift, foaming, fouling, filtration breakthrough and biological upsets generated as scenario variants to stress-test autonomy and train the perception and control agents. Planned.
Blower and pump scheduling, chemical dosing windows, membrane cleaning, backwash timing and fleet maintenance routes solved under energy tariff, labour, asset and permit constraints.
ETL over high-volume SCADA tags, lab results, membrane data, alarms and image metadata to build features and golden evaluation sets. Planned.
Supervised robotic sampling routes, asset-inspection rovers and materials handling across intake, treatment and disinfection, where plant policy allows robots. Planned.
Hydrira reads and writes through the systems already in the plant. No parallel historian, no new HMI, no rip-and-replace. Connectors are built against each design partner's stack first; long-tail integrations are out of scope for the first release.
Plant SCADA, historians, PLC and DCS interfaces
Tag reads at 1 to 10 Hz, guarded setpoint writes, interlocks untouched
Coagulant, polymer, pH-adjust and disinfectant dosing controllers
Dose reads, bounded setpoint writes inside declared limits
Blower controls, DO and ammonia-based aeration control
DO and blower reads, bounded setpoint writes after approval
Membrane and RO skid PLCs, TMP, flux, conductivity, integrity monitors
Reads; flux and backwash writes inside the integrity envelope
Turbidity, pH, chlorine residual, nutrient, TOC and flow analyzers
Reads; drift and fault flags
Lab information systems, jar-test and grab-sample records
Reads for labels and calibration
Fixed cameras on clarifiers, basins, filters and membrane rooms; inspection robots
Streams fused at the edge; supervised routes
Utility MES, maintenance systems, permit and reporting systems, weather
Reads; shift record and report drafts written back
Hydrira writes to control equipment in a plant that keeps a community's water safe. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I + critical-infrastructure cyber review | Cloud control plane, edge | QUEUED Roadmap, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Roadmap, 6 to 12 months |
| SDWA · discharge permits · EU WFD · nutrient and PFAS rules | Grounding and record-keeping | RUNNING Design basis for retrieval and the audit log |
| Per-tenant isolation | Data, memory, models | RUNNING Design rule |
| On-prem or edge-only deployment | Utilities, critical infrastructure | RUNNING Design option |
Hydrira supports your compliance records. It is not a certification, it does not replace your permit and it never removes the operator of record from a compliance decision.
One policy model, one audit trail and one set of energy, chemical, compliance and water-quality benchmarks across every plant in the fleet, with each site's permits, SOPs and process models kept private to that site.
The questions operations managers, process engineers and compliance leads ask in the first meeting.
Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits. Every design partner starts in shadow mode, where Hydrira predicts and writes nothing. Assist mode follows, where a process engineer approves each move. Bounded write-back comes last, per loop, after the accuracy gate and compliance sign-off, and can be pulled back at any time.
No. Permit-limit setpoints, disinfection residual minimums, integrity limits and discharge release decisions are read and checked, never written. Permia evaluates every planned move against the permit set and blocks anything that would thin a margin. The operator of record stays the operator of record.
The plant keeps running on its existing SCADA, PLC and DCS control and interlocks. Hydrira is supervisory, not primary. Loss of Hydrira is loss of advice, and the gap is recorded in the shift record.
Shadow mode starts with the SCADA tags, analyzer streams and lab records you already have. Accuracy is measured against your own lab and analyzer baseline, and the first-release plan converts to assist mode only when the number is proven. The design targets assume telemetry you already collect, not new instrumentation.
Telemetry, permits, SOPs and models are tenant-scoped, and an on-prem or edge-only deployment is available for utilities. Cross-plant learning is federated and IP-isolated, planned and opt-in: patterns for similar basins, membranes and influent regimes move, raw data does not.
Not yet, and the site does not claim it. SOC 2 Type I with a critical-infrastructure cyber review is on the roadmap for the first six months, Type II for the six to twelve month window. Safe Drinking Water Act, discharge permit, EU Water Framework and nutrient and PFAS rules are what the retrieval grounds on and what the audit log is aligned to; that is a design basis, not a certification.
The one with the clearest number. Aeration energy on an activated-sludge plant, coagulant cost on a dosing train or membrane run length on an RO or MBR train are the usual wedges, because kilowatt-hours, chemical invoices and cleaning counts are already measured. Turbix is the sensing wedge where visibility is the first problem.
Two to four utilities or industrial sites instrument one wedge process in shadow mode and baseline energy, chemicals and compliance from their own records. Assist mode proves accuracy and ROI with an engineer approving each move. Graduated autonomy follows on low-risk loops. Expansion adds adjacent processes, then fleet sites. Gates, not dates.
If you sell to utilities and industrial water operators, the first conversation is about one of their processes.
↑↓ navigate↵ openesc close