About

The plant keeps a community healthy. It should not run on memory.

Hydrira exists to move the craft of water and wastewater treatment into reliable, auditable AI, so every cubic meter is dosed, filtered, disinfected and compliance-assured whether or not a veteran operator is on shift. The plant runs itself; the people who know the water decide how far.

Independent product companyDesign stageWater and wastewater only

run_scn_0418 · agent graph · scenario 10 nodes · 1 approval gate
01 · intake_screen Read influent and forecast ✓ SUCCEEDED 02 · orchestrator Rehearse the next 24 hours ✓ SUCCEEDED 03 · quality_anomaly Fuse cameras and analyzers ✓ SUCCEEDED 04 · dose_coagulate Compute the dose curve ✓ SUCCEEDED 05 · dose_coagulate Trim the coagulant setpoint ✓ SUCCEEDED 06 · aerate_bio Minimum-energy DO schedule ✓ SUCCEEDED 07 · orchestrator Blower move approved ◆ APPROVAL 08 · membrane_disinfect Flux hold and backwash timing ✓ SUCCEEDED 09 · compliance_energy Permit conformance check ✓ SUCCEEDED 10 · conformance Write the shift record ✓ SUCCEEDED

Illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Not a measured run.

Why

Why we are building this

Clean water and safe effluent are the foundation of public health, industry and the environment. Drinking-water, municipal and industrial wastewater, desalination and reuse plants treat billions of cubic meters a day, and running one is still among the most craft-bound, energy-intensive and compliance-critical processes in public infrastructure.

Influent is screened and buffered, chemicals are dosed for coagulation and clarification, water is filtered and pushed through membranes against fouling, disinfected to an exact residual without byproducts, aerated through biological and nutrient-removal processes, and the sludge is dewatered, all to a drinking-water or discharge-permit spec under real-time, variable load. A drift at any step is a permit excursion, a health risk, wasted chemicals and energy, or asset damage.

Most plants run this on fixed setpoints, operator rounds, periodic lab samples and the judgement of a shrinking pool of operators. The tools they have observe and alarm. None of them act. That is the gap.

Why now

  • Water scarcity and the reuse and desalination shift
  • Aging infrastructure and the reinvestment to replace it
  • Tightening nutrient, PFAS, discharge and drinking-water regulation
  • Energy and decarbonization mandates on the plant's largest loads
  • Climate-driven wet-weather variability
  • A severe, retiring water-operator workforce across many remote sites
  • Online water-quality sensing, edge AI, advanced process control, robotic inspection and plant digital twins finally mature for treatment plants
Principles

How we build

Trust before autonomy

Compliance, cybersecurity, grounding, audit, human-in-the-loop and graduated control come before any write to a plant.

Permit margin outranks energy

No saving is worth an excursion. The arbitration rules say so, and the code enforces it.

Corrections are the product

Every supervised correction trains the system. The craft of the operators we work with is what we are encoding.

Land narrow, expand on the number

One process, one baseline, one gate at a time, then the plant, then the fleet.

Honest status

Design stage, no plant connected, no result claimed. The site says so on every page.

Public water is public trust

The plants we work with keep communities healthy. We build as if a regulator is reading the record, because one will be.

Run timeline

What we are actually building

Every Hydrira run is an ordered, inspectable sequence. This is run_scn_0418, an illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Ten steps, nine automatic, one human approval on the blower setpoint move, every action written to the shift record.

run_scn_0418 scenario · not measured SUCCEEDED
  1. 01 Read influent and forecast SUCCEEDED 1.2 s

    Intake-and-Screen · Flow, turbidity, ammonia and alkalinity at the headworks, and a 24-hour rain forecast that raises the expected influent by mid-afternoon.

  2. 02 Rehearse the next 24 hours SUCCEEDED 4 min 10 s

    Plant orchestrator · Simflo evaluates candidate dose, DO and flux plans over the 24-hour horizon and keeps the plans that hold permit margin through the surge.

  3. 03 Fuse cameras and analyzers SUCCEEDED 180 ms

    Quality-and-Anomaly · Clarifier blanket, foam and colour from the basin cameras fused with turbidity, pH, nutrient and residual analyzers into one calibrated plant state.

  4. 04 Compute the dose curve SUCCEEDED 2.4 s

    Dose-and-Coagulate · Coagulant and polymer dose ramp for the surge window under turbidity, phosphorus, sludge and chemical-cost constraints, cited to the plant's dosing SOP.

  5. 05 Trim the coagulant setpoint SUCCEEDED 0.6 s

    Dose-and-Coagulate · A bounded setpoint move inside the declared rate and magnitude limits for the dosing pump, with the rollback value recorded first.

  6. 06 Minimum-energy DO schedule SUCCEEDED 3.1 s

    Aerate-and-Bio · Blower and DO setpoint schedule across the basins that meets the nitrogen and phosphorus targets at the lowest kilowatt-hours the biological state allows.

  7. 07 Blower move approved APPROVAL 6 min 02 s

    Plant orchestrator · The DO setpoint change is above the plant's threshold for this loop. The process engineer on shift reviews the predicted nutrient margin and approves.

  8. 08 Flux hold and backwash timing SUCCEEDED 1.8 s

    Membrane-and-Disinfect · Flux held through the surge and the next backwash moved earlier, inside the integrity envelope; the disinfection residual minimum is untouched.

  9. 09 Permit conformance check SUCCEEDED 0.9 s

    Compliance-and-Energy · Every planned setpoint checked against the discharge permit, the nutrient limits and the residual minimum, with excursion risk forecast for the horizon.

  10. 10 Write the shift record SUCCEEDED 0.3 s

    Quality-and-Conformance · Inputs, model versions, predictions, limits, the approval and every write appended to the immutable shift record the plant owns.

Focus

What kind of company this is

What we are

  • An independent startup building original physical-AI software for water and wastewater treatment
  • A product company: recurring software, priced per process, per plant and per fleet
  • GPU-essential by design: plant-edge vision and sensor fusion, process and biological simulation, synthetic rare events, model training, constrained optimization
  • Water and wastewater only, from the headworks to the outfall

What we are not

  • Not a consultancy, systems integrator or outsourced development firm
  • Not a reseller or a division of an equipment OEM or a utility
  • Not a dashboard; a system that acts, with a person above the threshold and the permit around everything
  • Not claiming customers, results or certifications we do not have
Accelerated computing

Physical AI, at the plant edge

A treatment plant runs around the clock on variable influent, and many utilities keep plant data on site, so perception and control inference run at the plant edge. Hydrira keeps training, simulation and optimization in the cloud, in a private cloud or on-prem. Items marked planned are on the roadmap, not running.

Jetson Orin / Thor · TensorRT · DeepStream · Holoscan

Plant-edge inference

TensorRT-optimized time-series and vision models at the plant edge; DeepStream pipelines for clarifier, basin and filter cameras; Holoscan fusing camera streams with turbidity, pH, chlorine and nutrient analyzers at 1 to 10 Hz. Jetson Thor is planned.

Triton · NIM · NVIDIA AI Enterprise

Model serving

Water-quality forecasting, anomaly detection, control recommendation and compliance retrieval served with per-tenant routing, model versioning and an audit id on every call. Self-hosted for utility on-prem and edge deployment. Planned.

DGX / HGX · NeMo

Training and fine-tuning

Time-series transformers, vision models and NeMo-tuned process and compliance reasoning trained on plant telemetry, operator corrections, images, alarms, lab results, permits and SOPs. Design target: weekly fine-tuning per design-partner cohort, then monthly fleet refreshes. Planned.

Omniverse · OVX · Modulus

The as-run twin

Simflo runs plant hydraulics, clarifier and filtration behaviour, membrane fouling, oxygen transfer and biological response as a GPU simulation calibrated to the live plant, with Modulus surrogates for fast evaluation. Planned.

Cosmos · Omniverse Replicator

Synthetic rare events

Wet-weather surges, sensor drift, foaming, fouling, filtration breakthrough and biological upsets generated as scenario variants to stress-test autonomy and train the perception and control agents. Planned.

cuOpt

Optimization

Blower and pump scheduling, chemical dosing windows, membrane cleaning, backwash timing and fleet maintenance routes solved under energy tariff, labour, asset and permit constraints.

RAPIDS

GPU analytics

ETL over high-volume SCADA tags, lab results, membrane data, alarms and image metadata to build features and golden evaluation sets. Planned.

Isaac · Jetson

Robotics

Supervised robotic sampling routes, asset-inspection rovers and materials handling across intake, treatment and disinfection, where plant policy allows robots. Planned.

Market

The market

Water and wastewater automation, SCADA and process control, chemical-dosing and aeration optimization, membrane and disinfection control, water-quality sensing and analytics, and utility plant software. Autonomous dosing, aeration and membrane control, water-quality and anomaly sensing, energy optimization and plant digital twins are the fastest-growing segments.

$18B Total addressable market: water and wastewater automation, SCADA and process control, chemical-dosing and aeration optimization, membrane and disinfection control, water-quality sensing and analytics, and utility plant software
$4.5B Serviceable: the autonomous-control, sensing, energy-optimization and digital-twin segments Hydrira directly addresses
$270M Obtainable within three years via design-partner utilities and industrial operators expanding from process to plant to fleet
~12% Annual growth, pushed by scarcity and reuse, aging infrastructure, nutrient, PFAS and discharge regulation, energy mandates and the operator shortage
Team

Who is building it

Hydrira is led by its founder and CEO, Charles Weston, and its CTO, Aaron Mitchell. The profiles below describe what each of them owns and the ground they cover.

Founder & CEO

Charles Weston

Charles runs the company and owns the design-partner relationships, the pilot structure and the commercial model. He decides which treatment plant and which process go first, what effluent-quality, energy, chemical-dosing or permit-compliance number a pilot is judged on, and who at the utility signs off on the baseline.

Focus: water and wastewater treatment operations, utility economics and compliance, partnerships and go-to-market.

CTO

Aaron Mitchell

Aaron owns the plant-edge runtime, the aeration, coagulation, membrane and disinfection models, the as-run plant digital twin, and the audit architecture behind every Hydrira agent. He is accountable for the bounded, logged write-back through SCADA into blowers, dosing pumps and membrane controls, and for every agent starting in shadow mode.

Focus: edge computer vision, sensor fusion, process control, simulation and digital twins, safety-critical infrastructure software.

Hiring

The roles we are building around are on the careers page. We look for people with hands-on water or wastewater operations, applied AI at the edge, and experience shipping regulated, safety-critical software or hardware into critical infrastructure.

The roles we are building around

The name and the mark

Hydrira is built on hydro, the defining element of the industry, with an ending that matches the portfolio it belongs to. The mark reads left to right: two navy wave lines carrying scattered contaminant dots, the raw feed; a vertical porous membrane wall of five short blue bars; and the same two waves continuing in aqua with no dots, the clean permeate. It shows what a treatment plant is for: the same water, with the solids held back at the barrier Hydrira operates.

Blue and teal belong to the category. The raw-water side lifts from navy to a lighter blue on dark backgrounds so it does not disappear. The flow is never mirrored and the clean side never gets dots.

Writing

Recent notes

Origin

Aeration is the power bill

Walk into a wastewater plant and ask where the electricity goes. The answer, more often than not, is the blowers. Aeration can be the majority of a plant's powe…

Why now

The craft is walking out the door

A treatment plant is a living process. Influent changes with the weather and the load, and a handful of experienced operators keep it inside spec by feel. When …

Simflo

Rehearse the surge

Rain is forecast for the afternoon and the influent will rise by a third. What should the dose do, and when? What happens to the nutrient margin if the DO sched…

From the plant floor

Who this is built for

The three people in a treatment plant whose week changes when the process runs itself, and what each of them needs from Hydrira.

Economic buyer

Plant or Operations Manager

Owns compliance, reliability, energy, chemicals and cost. Wants autonomous, compliant, lower-energy, lower-chemical treatment, and a number that justifies the spend.

Champion

Process or Water Engineer

Owns dosing, aeration, membrane and biological strategy, the process windows and the performance. Needs recommendations they can inspect, correct and trust before any loop is handed over.

Approver

Compliance, Sustainability and Energy Lead

Owns permit compliance, water quality, energy and environmental reporting and the licence to operate. Needs every action cited, logged and defensible in front of a regulator.

IT/OT and critical-infrastructure cybersecurity leads approve the deployment. There are no customer quotes on this site yet; design partners will be the first voices.

Guardrails

An agent that can move a setpoint needs a leash

Hydrira writes to control equipment in a plant that keeps a community's water safe. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits, at the autonomy stage the plant has set.
  • Permit limits are read, never written. Permit-limit setpoints, disinfection residual minimums, integrity limits and discharge release decisions stay with the permit and the operator of record.
  • Policy engine before every write. Autonomy stage, interlock state, permit margin, excursion forecast and operator presence are evaluated before a setpoint moves.
  • Grounded and cited. Every recommendation carries a citation to the permit, SOP or regulation it relied on. Retrieval is tenant-isolated and permission-aware.
  • Immutable audit log. Append-only, exportable and retained on the plant's own storage, aligned to Safe Drinking Water Act, discharge-permit and EU Water Framework record-keeping.
  • Hard fallback. If the edge node, the network or a model stops, the plant keeps running on its existing SCADA, PLC and DCS control and interlocks.
  • Tenant isolation and critical-infrastructure posture. Telemetry, permits, SOPs and models never cross a customer boundary. On-prem and edge-only deployment available for utilities.

Assurance posture

Assurance and certification status
ItemScopeStatus
SOC 2 Type I + critical-infrastructure cyber reviewCloud control plane, edge QUEUED Roadmap, first 6 months
SOC 2 Type IICloud control plane QUEUED Roadmap, 6 to 12 months
SDWA · discharge permits · EU WFD · nutrient and PFAS rulesGrounding and record-keeping RUNNING Design basis for retrieval and the audit log
Per-tenant isolationData, memory, models RUNNING Design rule
On-prem or edge-only deploymentUtilities, critical infrastructure RUNNING Design option

Hydrira supports your compliance records. It is not a certification, it does not replace your permit and it never removes the operator of record from a compliance decision.

Read the security overview

FAQ

Straight answers

The questions operations managers, process engineers and compliance leads ask in the first meeting.

Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits. Every design partner starts in shadow mode, where Hydrira predicts and writes nothing. Assist mode follows, where a process engineer approves each move. Bounded write-back comes last, per loop, after the accuracy gate and compliance sign-off, and can be pulled back at any time.

Get started

Come build the plant's operating system

Design partners, future colleagues and the people who sell to utilities: the first conversation is about one process.