Clean water, every hour of every day.

Hydrira is software for water and wastewater treatment plants. It watches every stage of the plant, plans chemical doses, aeration and filter cleaning ahead of the weather, and changes a setpoint only when your plant has said it may.

Hydrira is at the design stage. No plant is connected yet, and every figure on this page is a design target or an illustrative scenario. We are looking for two to four utilities and industrial sites to be the first design partners.

Follow the water through the plant

A drinking-water plant is a chain of six steps. Each one can drift with the weather, the season or a tired instrument. Here is what happens at each step, what tends to go wrong, and what Hydrira does about it.

  1. Intake and screening

    Water from a river, lake or reservoir comes in and is screened of debris.

    What goes wrong
    Rain and snowmelt change how much water arrives, and how muddy it is, within hours.
    What Hydrira does
    Reads flow, the weather forecast and upstream readings, and holds intake and equalization steady so the rest of the plant sees a buffered feed instead of a surge.

    Intake-and-Screen agent, in the Plant plan

  2. Coagulation

    A coagulant is dosed into the water so that fine particles start to clump together.

    What goes wrong
    Doses are set from jar tests and then chased by hand as the incoming water changes. Too little and the water stays cloudy; too much and the chemical bill and sludge grow.
    What Hydrira does
    Forecasts incoming turbidity, alkalinity, temperature and organic carbon, and ramps the coagulant, polymer and pH dose before a surge rather than after it.

    Product: Coagen

  3. Flocculation and settling

    Slow mixing grows the clumps into floc, which settles out in the clarifiers.

    What goes wrong
    Plants run blind between grab samples. A rising sludge blanket or weak floc is often noticed only when the lab result comes back.
    What Hydrira does
    Cameras on the clarifiers watch the blanket, floc, foam and colour. Hydrira combines them with the online analyzers into one checked picture of water quality and warns before the lab would.

    Product: Turbix, working with Coagen

  4. Filtration

    Sand and media filters, or membranes, catch what settling left behind.

    What goes wrong
    Filters on a fixed backwash timer either waste water or run too long and let particles through. Membranes foul, and cleaning them late can do lasting damage.
    What Hydrira does
    Predicts when a filter will break through and schedules the backwash just in time. On membrane trains it predicts fouling and schedules backwash and cleaning before it is too late.

    Settle-and-Filter agent, and Membraq for membranes

  5. Disinfection

    Chlorine or another disinfectant makes the water safe to drink.

    What goes wrong
    Too little disinfectant is a public-health risk. Too much wastes chemical and forms unwanted byproducts.
    What Hydrira does
    Holds the residual close to its minimum and never writes a value below that minimum. The minimum belongs to your permit and your operator, not to the software.

    Membrane-and-Disinfect agent, in Membraq

  6. Leaving the plant

    Treated water goes out to the distribution network, and the day's records go to the regulator.

    What goes wrong
    Lab results, analyzer logs and operator notes sit in different places, and the monthly report takes days to assemble.
    What Hydrira does
    Builds the shift record as it goes, checks it against the permit and your procedures, and drafts the regulatory report with a source cited for every number.

    Product: Permia

Running a wastewater plant instead?

The chain is different but the approach is the same. Hydrira manages aeration and nutrient removal in the biological basins with Aerix, and sludge wasting and dewatering with the Sludge-and-Dewater agent. The energy section below explains why aeration is usually where a wastewater plant starts.

Your permit sets the limits. Hydrira works inside them.

A plant that keeps a community's water safe cannot hand its permit to a piece of software. Hydrira reads the permit, checks every planned move against it, and leaves the legal decisions with your operator of record.

  • Permit-limit setpoints are read, never written. Hydrira can see them; it cannot change them.
  • Disinfection residual minimums are never undercut. No saving on chemical or energy outranks them.
  • Membrane integrity limits stay as set. Flux and cleaning moves stay inside the integrity envelope.
  • Discharge release decisions stay with people. The operator of record is never removed from a compliance decision.

Checked before any setpoint moves

  1. Has the plant allowed this loop?Every plant starts in shadow mode, where Hydrira predicts and writes nothing. Each loop is promoted separately.
  2. Are the interlocks clear?Existing SCADA, PLC and DCS interlocks are never bypassed.
  3. Does the permit margin hold?Permia checks the move against every applicable permit and regulation.
  4. What does the forecast say?Excursion risk is forecast hours ahead, not just for this minute.
  5. Is an operator present?Moves above the plant's threshold go to a named person for approval.

If any answer is no, nothing is written, and the reason goes into the shift record.

Where Hydrira stands on assurance today. It supports your compliance records; it is not a certification and does not replace your permit.
ItemScopeStatus
SOC 2 Type I and critical-infrastructure cyber reviewCloud control plane, edge Planned First 6 months
SOC 2 Type IICloud control plane Planned 6 to 12 months
Safe Drinking Water Act, discharge permits, EU Water Framework, nutrient and PFAS rulesWhat answers are grounded on and how records are kept Design basis
On-premises or edge-only deploymentUtilities and critical infrastructure Design option

Rain at two, planned for at dawn

One municipal wastewater plant with a membrane train. At 05:40 the forecast shows rain from 14:00. This is how the plan for that afternoon gets made, step by step, before the first drop falls.

Illustrative scenario, not a measured event

  1. The forecast comes in

    Rain from 14:00, with the flow into the plant expected to be about 38% higher by 17:00. Incoming turbidity is 118 NTU.

    Intake-and-Screen agent
  2. The afternoon is rehearsed first

    The plant's digital twin tries 240 possible plans for the next 24 hours. 31 of them keep the permit margin all the way through the storm; the cheapest of those is chosen.

    Simflo, the as-run plant twin
  3. Coagulant goes up before the rain, not after

    The plan ramps coagulant from 38 to 46 mg/L starting at 13:30. The first step, to 42 mg/L, is inside the limits the plant declared for that pump, and the old value is recorded so it can be put back.

    Coagen, allowed to write on this loop
  4. A blower change waits for a person

    Lowering dissolved oxygen from 2.0 to 1.6 mg/L in three basins would save energy, but it is above this loop's threshold. It goes to the process engineer on shift with the predicted nutrient margin attached.

    Aerix, recommend-only on this loop
  5. The engineer approves

    After six minutes the engineer approves, noting the nutrient margin stays 0.6 mg/L above the limit.

    Process engineer on shift
  6. The membrane clean moves earlier

    Flux is held at 24 LMH through the surge and the next backwash moves from 16:00 to 13:15. The disinfection residual minimum is not touched.

    Membraq
  7. The permit is checked, then everything is written down

    Every planned setpoint is checked against the discharge permit for the next 24 hours: all inside limit, excursion risk low. The inputs, the approval and each change go into a shift record the plant owns.

    Permia
  8. The plant is ready when the rain starts

    Backwash done at 13:15, coagulant ramp under way from 13:30. The plan predicts effluent turbidity stays under 2 NTU through the surge.

    The plan, as rehearsed at 05:44

Ten steps, one human approval. This is scenario run_scn_0418 from the platform walkthrough, written to show how a plan is made and recorded. None of these numbers come from a real plant.

The blowers are the biggest power bill

At a wastewater plant, blowers push air into the basins so that bacteria can break down the waste. Aeration alone can be the majority of the plant's electricity, and because running short is risky, blowers are usually set high and left there.

Aerix follows the actual load and the state of the biology through the day, and works out the lowest air supply that still meets the nitrogen and phosphorus limits. When dosing could remove phosphorus more cheaply, it coordinates with Coagen.

What is measured
Kilowatt-hours per cubic meter treated, nutrient margin and upset count
Where the number comes from
Your own energy meters and nutrient analyzers
When
In shadow mode, before Hydrira writes anything
Result
Measured when the pilot runs. We do not claim one in advance.
Illustrative day at a wastewater plant. The incoming load rises in the morning and evening. A fixed blower setting stays high all day. A load-following setting tracks the load, staying above it, and the shaded gap between the two lines is the energy a pilot would measure. 00:0012:0024:00 Fixed air supply Air that follows the load Incoming load Air supplied
Shape only, no real data. The shaded gap is what a pilot measures from your meters.

Six products, bought one at a time

Each product handles one job and can be bought on its own. Most plants start with one, prove the number, then add the next.

  • Coagen

    Chemical dosing

    Sets coagulant, polymer and pH doses so water reaches the target clarity at the lowest chemical cost.

    Usual startOne dosing train at a drinking-water plant

  • Aerix

    Aeration and biology

    Keeps the air supply to the basins at the lowest level that still meets nitrogen and phosphorus limits.

    Usual startOne basin group at a wastewater plant

  • Membraq

    Membranes and RO

    Predicts membrane fouling and times backwash and cleaning, so trains run longer between cleans with integrity protected.

    Usual startOne train at a desalination, reuse or MBR plant

  • Turbix

    Water-quality sensing

    Combines plant cameras with online analyzers so drift is seen before the lab result, and checks the analyzers themselves.

    Usual startOne clarifier, where seeing the problem comes first

  • Simflo

    Plant digital twin

    A working model of your plant that tries each plan before the shift, including storms, fouling and upsets.

    Usual startIncluded in the Plant plan

  • Permia

    Permit assurance

    Forecasts excursions, blocks any move that would thin a permit margin, and drafts regulatory reports with sources.

    Usual startFrom day one at water-reuse sites; checks every write elsewhere

Three people at the utility have to say yes

These are the questions each of them brings to the first meeting, and the answer Hydrira is built to give.

Will it lower the power and chemical bills without putting the permit at risk?

Each product closes a loop your plant already measures in kilowatt-hours, chemical invoices and cleaning counts. The baseline comes from your own meters in shadow mode, before anything is written.

Plant or operations managerOwns compliance, reliability, energy and cost

Can I see why it wants to make a change, and correct it when it is wrong?

Every recommendation shows its prediction and its source. In assist mode the engineer approves, corrects or rejects each move, and those corrections train the models.

Process or water engineerOwns dosing, aeration, membrane and biological strategy

If a regulator asks why the dose changed at 05:44, can I show them?

Every reading, recommendation, approval and write is kept in an append-only record on the plant's own storage, cited to the permit or procedure it relied on, and exportable.

Compliance, sustainability or energy leadOwns permit compliance and reporting

These are the roles Hydrira is designed for, not customer quotes. There are no customers yet; IT/OT and cybersecurity leads approve the deployment itself. Who Hydrira is for

Prices you can put in a budget request

List prices are published. Start with one process, measure it, and expand by process, plant and site when the number holds.

Price schedule, in US dollars, before annual or multi-year discounts.
PlanList priceWhat it covers
Process $12,000per treatment process or area, per month One of Coagen, Aerix, Membraq or Turbix on one process, with plant-edge runtime and connectors, shadow, assist and bounded stages, a review console and audit log, and permit-checked writes through Permia.
Plant $80,000per plant, per month The whole plant: intake, dosing, settling and filtration, membranes and disinfection, aeration and biology, sludge and dewatering, quality sensing, compliance and energy, and the Simflo twin.
Enterprise Customfirst contracts from $600k to $9M a year A multi-site utility or industrial fleet, custom process, compliance and energy models per site, a plant-edge fleet, and service levels.

Contract terms

Annual prepayment
A 15 to 20% discount.
Multi-year agreements
For utilities and enterprises, with usage ramps tied to flow and number of sites.
Outcome components
For enterprise deals, a share of measured energy, chemical, compliance or reliability improvement.
Discounts
Floor prices are protected. Discounts are traded for contract length and public-sector references.

For your procurement file

  • On-premises or edge-only deployment is available for utilities.
  • Your plant data, permits and models never cross to another customer.
  • If Hydrira stops, the plant keeps running on its existing SCADA, PLC and DCS control.
  • The audit record is append-only, kept on your storage and exportable.
  • Every engagement starts in shadow mode, where nothing is written.
  • SOC 2 is on the roadmap, not yet achieved; see the status table above.

Full pricing details
Security overview

Questions from the first meeting

Tell us about one process at your plant

Pick the one with the clearest number: kilowatt-hours on aeration, chemical cost on a dosing train, or run length on a membrane train. In shadow mode you see the number before Hydrira writes anything.